Steel Project Index / SDS2 Reports / Drawing + Rev Register
SDS2 Report Writer template · for the PM · FREE

Drawing + Rev Register

Sheet list with revision level, date, drawn by, and approval status — plus a revision history table.

DRAWING REGISTER JOB 2412 ------------------------------------------------------ SHEET TITLE REV DATE BY STATUS E1 Anchor bolt plan 2 07/18/26 JT Approved E2 Erection plan 1 07/02/26 JT Approved B101 Beam details 3 07/29/26 JT In review ------------------------------------------------------ REV HISTORY B101: 1 06/20 issue - 2 07/11 - 3 07/29

Sample output — layout representative, numbers illustrative. Your job's data fills it.

Who it's for
The PM.
What's in it
Every detail and erection sheet · current revision level and date · drawn by · approval status · revision history per sheet.
Why it exists
Revision tracking is a named deliverable on real contracts, and approval status lives in the model — SDS2 has sheet lists and member revisions, but not the register format submittals ask for.
How it's built
Built on DetailSheet (73 fields), ErectionSheet (60 fields), and GatherSheet.RevisionLevel/ApprovalStatus.

Install — about a minute, once it ships

  1. Save the template file.
  2. Drop it into your job's Job\reports\Detailing\ folder.
  3. In SDS2, run it from Run Report Writer Report.
Status: in build — not available to download yet. There is no file behind this page today, and a free account will not get you one. Each template is written and run in SDS2 on a real job before its download is enabled here. The weekly brief announces each one the day it ships.

Verify report output against your project documents before fabrication. Templates are original SPI work built on the verified SDS2 ModelAll field catalog — every field path they use is checked against it, never guessed.

The weekly steel brief

One email. One new tool or template. Every week.

A copy-ready RFI or worksheet, a calculator or SDS2 template, and directory updates. No filler, unsubscribe anytime.